Isiolo County

Building in Isiolo

Isiolo is the gateway to the north and it is growing with the corridor. Building here is a different problem from building on the mountain, because heat and water replace cold and rain as the things the design has to solve.

About 1,150mAbout an hour and a half from Nanyuki.

What people are building here

  • Family homes and rental units in and around town
  • Shops, offices and small commercial buildings
  • Staff housing and compounds

What changes the design and the price in Isiolo

Heat is the design problem

Deep verandas, shaded windows, cross ventilation and a ventilated roof space do more for comfort than any amount of air conditioning. Get those right and the house is liveable without running a machine all day.

Water is bought

Water on site during construction is often delivered and paid for, which is a genuine cost line rather than an assumption. It also argues for construction methods that use less water where they are suitable.

Long haulage

Cement, steel and roofing all travel further, which is why our regional adjustment for Isiolo is the highest on the mountain side. Ordering in full loads rather than in trips makes a visible difference to the final figure.

Approvals

Isiolo County approves plans. Allow extra time in the programme for submission and follow up given the distance.

What materials cost here

Everything except sand and hardcore travels further. Water on site is often bought and carted, which is a real line item, not an afterthought.

Materials here run about 8 percent above our Laikipia base price on the same items.