Skip to content
TimberStoneDesign and Build Contractors, NanyukiCall us
More pages

Design and build contractors, Nanyuki

Building contractors in Nanyuki.From the drawings to the keys.

Architectural and structural designs and drawings, county submissions and foundation-to-finish construction for homes and commercial projects in Laikipia and the Mount Kenya region. Our own kiln, timber treatment facility and joinery workshop supply the finishes.

  • Our own kiln and joinery workshop
  • An architect and a structural engineer on the team
  • Quotes itemised line by line

Living outside Kenya? Plan your build from abroad.

Aerial progress view of TimberStone's single-storey Sweetwaters holiday-home bungalow with its separate utility building behind it
Drawings and build
Architect, structural engineer and site team in the same office
Our own kiln and workshop
Timber drying and joinery manufacturing under one company
Laikipia and around
Nyeri, Meru, Isiolo, Nyandarua, Samburu, Embu, Kirinyaga

Foundation-to-finish construction and kiln-dried timber products in Nanyuki

TimberStone Development Limited is a premier building contractor in Nanyuki, Kenya, delivering complete foundation-to-finish residential and commercial construction. Our unique advantage is our in-house kiln drying and timber treatment facility. We manufacture premium, durable timber products—including custom doors, floors, ceilings, cabinetry, and furniture—ensuring unmatched quality from the ground up.

Start with architectural designs and drawings, structural designs and drawings, an existing set of plans, or a standalone workshop order. Choose the service you need below.

Our work

3 jobs on site now

See our Sweetwaters holiday-home bungalow, managed from drawings for an owner in Germany, and our pool and pool-house work at Lolldaiga. Each project shows its scope and progress photographs.

What we build

What we build

Family houses, cottages for short stay letting, rental units, farmhouses on plots with no mains water or power, and extensions to houses that are already standing.

See everything we build

Planning a local project? Read our Nanyuki plot and site planning guide for the access, water and site questions to discuss before design.

How we work

How a job runs

Seven stages, from the first visit to your plot through to handover. We do the drawings, the structural design and the building ourselves, so there is one contract and one team on site.

  1. 01

    Concept and feasibility

    A visit to the plot, a look at the ground, and a rough cost. This happens before you pay for any drawings.

    1 to 2 weeks

  2. 02

    Architectural design and drawings

    Floor plans, elevations, sections and the drawings the county wants to see. We draw them in our own office.

    3 to 5 weeks

  3. 03

    Structural designs and drawings / civil engineering

    Foundations, slabs, columns and roof structures, sized from trial pits dug on your plot.

    2 to 3 weeks

  4. 04

    County approvals and permits

    We prepare and submit the drawings, then follow the approval through the county on your behalf.

    4 to 8 weeks, depending on the county

  5. 05

    Construction and concrete works

    Stone and concrete construction by our own team. Foundation, walling, slabs, roofing and plaster.

    Programmed per project

  6. 06

    Joinery and interior fit out

    Doors, ceilings, floors, wardrobes and furniture, milled in our own workshop from timber we dried ourselves.

    Runs alongside finishing

  7. 07

    Snagging and handover

    We walk the house with you and write down everything still outstanding. We finish that list before we ask for the last payment.

    1 to 2 weeks

Solid timber doors standing in the TimberStone workshop in Nanyuki, including two tall hardwood entrance doors, a panel door, a door in its frame with a fanlight, and a glazed door

What makes us different

Custom timber furniture, doors and interiors in Nanyuki

Most contractors here buy joinery in. We have a kiln and a workshop, so the doors, ceilings, floors and wardrobes in your house are cut and fitted by our own people.

Drying timber takes about three weeks and it costs money, so it is the step most often skipped. Undried timber shrinks once it is inside a warm finished house. Doors stop closing, floors gap and wardrobe doors go crooked. We build the house and we make what goes into it, so that problem comes back to us.

Solid timber doors and framesTimber ceilingsTimber flooring and skirtingsFitted wardrobes and kitchen unitsFurniture and bespoke pieces

Budget

What does it actually cost?

We publish indicative construction costs and material price ranges, with their review date. Use them to plan a starting budget, then ask us for an itemised quotation.

Tell us about your plot

Send the location, the plot size and roughly what you want to build. We will give you a budget range and tell you what to do next.

Privacy choices

May we use Google Analytics and record page visits and contact clicks to measure enquiries? Both are off until you allow it. Enquiry text is not collected. No advertising tracking.